T H E A T R E  R E N O V A T I O N S

New Stage, New Rigging, New Curtains, New Attitude
Old Stage Cleaned
Concrete base after stage removed
Concrete base after stage removed
New rigging pipe and tracks
New stage underlayment
Concrete base after stage is removed
Concrete base from loft
Removal of old winches
New stage underlayment
New rigging in place
Concrete base after stage removed
Old curtains down
New winches before installation
New underlayment
Rigging
Concrete after stage removal
curtains removed
photo 3 (2).JPG
photo 2 (7).JPG
photo 2 (6).JPG
photo 2 (4).JPG
photo 2 (3).JPG
photo 2 (2).JPG
photo 1 (6).JPG
photo 1 (5).JPG
photo 1 (3).JPG
Stage
Stage
Stage
Rigging
Rigging
photo 1 (4)_edited.JPG
R E N O  2 0 1 4

The original stage built in 1971 as part of the newest Hilton High School. This original stage had thousands of performances over the last 45 years. The music and theatre departments look forward to another 45 great years of performances in the newly renovated space.